ZIV Siemensxstedin hoogspanningskasten 2

High-voltage switches: from storage to placement

On behalf of Siemens, we installed high-voltage switches at Stedin's substation.

Before installation, the high-voltage switches were in storage with us in Delft. On the day of installation, we loaded them into a van from Zwatra Transport to the location of Stedin's substation. 

Using a truck-mounted crane, we then moved them into the substation. The heaviest part of the high-voltage switches was as much as 3200 kg!

That's how we do it at Zwatra Industriële Verhuizingen!

ZIV Siemensxstedin hoogspanningskasten 1
ZIV Siemensxstedin hoogspanningskasten 5
ZIV Siemensxstedin hoogspanningskasten 3

Other projects

Do you want to more information about this project?

Do you want to stay informed?

Sign up for the newsletter to stay up to date with all the news about the Boerman Groep!