On behalf of Siemens, we installed high-voltage switches at Stedin's substation.
Before installation, the high-voltage switches were in storage with us in Delft. On the day of installation, we loaded them into a van from Zwatra Transport to the location of Stedin's substation.
Using a truck-mounted crane, we then moved them into the substation. The heaviest part of the high-voltage switches was as much as 3200 kg!
That's how we do it at Zwatra Industriële Verhuizingen!